Case Study

Medlar Fruit Farms

About Client
Our client was a large-scale fruit producer growing fruit supplied to major UK supermarkets. A new packing shed was being built next to a large greenhouse that was a significant consumer of electricity and our client was looking to reduce overall operational costs.

Challenges
The project was a new build project, so perfect for Solfit in-roof panels, which maximised generation across both aspects of the packing shed roof.

Love Solar Solution
322 x 425W Solfit solar panels
Sigenergy M1 100kW Hybrid Inverter
6 x 12kWh Sigenergy SigenStack Battery

Installation Process
The large array was installed within 10 days, fitting well within the build timelines.

Results & Performance
The new solar array generates166MWh of solar power per year, leading to a saving of 29.56tonnes of CO2 emissions and 24.89tonnes of standard coal, the equivalent of 40 trees planted.

Project Snapshot

LOCATION:

Preston, Lancashire

SYSTEM SPECS:

In-Roof

ANNUAL OUTPUT:

166MW

panels installed:

annual saving:

Estimated £34,350

predicted payback: